Reduced Electricity Consumption in an Industrial Building

Energy efficiency project - Water supply system case study

Customer: Water supply system

Location: East Stroudsburg, Borough

Date: January, 2015

A timed test was performed with the BPU™ both “On” and “Off”. Power Factor increased by from a good .95 reading to a near 1 reading which is expected, due to the type of loads operating. The Location revealed a cumulative energy savings, measured in kW of 16.3%. This would result in monthly savings of approximately $160 for every $1,000.00 billed.

KW consumption and Power Factor are only few of the benefits provided by BPUTM.